An irrigation company must transport 5.71 x 10-2 m3/sec of water (20°C) from reservoir A to reservoir B. The reservoirs are separated by 600 m and have an elevation difference of 18.4 m. Determine the diameter pipe required if the relative roughness of the pipe material is 0.36 mm. (Include minor losses.) Would the solution differ if minor losses were neglected?
SOLUTION
Applying the energy equation;
🔒